This is the order in whic the data objects should be loaded. It is assumed for the purposes of this example that the well, borehole, and the borehole�s working coordinate system entries are already in existence.
1. Create the Perforation_Activity and associate it with the Borehole.
2. Create a Perforated_Interval record for each interval perforated by the activity.
3. Create a Perf_Interval_Status record for each record created in step 2.